Buildingreports
deutsch 

 02:22:42

About this category:

In the category of the buildingreports we want to present the Genesis of the "Kingdom of Madunia". Many images with comments and sometimes even with videos show you the progress in time - sometimes they are telling a short story too.

It would give us greate pleasure if we get comments and helpful suggestions to our buildingreports in our forum in the buildingreport-category. Also you can discuss the reports with our other visitors.

Have fun !



Buildingreport Number 32

Sunday, 2006-01-15 Completion the new segment of the wall

Images 1 to 4:
     
 

In the stonework only a small part was still missing and now it was supplemented. During this the powerrunts - as indicated in the last building reporting - had a lot of work...

Images 5 to 7:
     


Not only in the lower battlement cables have to be layed, also to the top cables have to be installed for the battlement-lighting.

Images 8 to 10:
     


At the walls the workmen attend for a smooth transition in the wall, before the loft was fixed.

Images 11 to 16:
     
     


A lot of LED-lamps was connected, installed and light-dense packaged - so that later nothing will gleam through the roof.

Images 17 to 21:
     
   

Also the madunish roofers had a lot to do.

Images 22 to 23:
   

The lighting of the upper battlement.

Images 24 to 27:
     
 

Still fresh: A short time ago the roof got the typical madunish colour of the castle with gold plated gables.



- back - contact